Serving Madison, Sun Prairie, Fitchburg, Middleton, Verona, Monona & nearby Dane County townsCall (608) 597-6094
Concrete Contractors in Mount Horeb, WI

The Troll Capital of the World

Concrete Contractors in Mount Horeb, WI

Driveways, patios, steps, walks and slabs built for the hills and high ground of the Driftless Area.

  • Free on-site measuring and a written, itemized quote
  • Repair, lifting and replacement priced side by side when each is an option
  • Help sorting out city sidewalk notices and driveway approach permits

Concrete on Driftless Hills

Mount Horeb is about 20 miles southwest of Madison along U.S. Highway 151, and it sits in a different landscape from the flat suburbs closer to the city. The village is in the Driftless Area, an unglaciated region of rolling hills, and at about 1,243 feet it is one of the higher places in our service area. For anyone hiring concrete contractors in Mount Horeb, that terrain matters. Sloped lots, long driveways and steps are common, and every one of them has to be built so water runs where you want it.

Building on a slope

On hilly lots the hard part of a concrete job is usually not the pour, it is the layout. Common Mount Horeb challenges include:

  • Steep driveways that need a broom texture for traction in snow and ice, and a plan for where runoff goes at the bottom
  • Garage aprons that meet a driveway falling toward the house, where a drain or regrading keeps water out of the garage
  • Front steps that climb from street level, where every riser should be the same height
  • Patios cut into a hillside that may need a step or a low edge on the downhill side

We set grades with a level and string before we form anything, and we show you where the water will go.

A village that kept growing

Mount Horeb had 4,182 residents in 1990, 5,860 in 2000, 7,009 in 2010 and 7,754 in 2020, and the 2010 census counted 2,826 housing units. Some of our jobs are near the main street, which the village calls the Trollway, and others are in newer neighborhoods on the edges of the village. We work on both, and we match the finish to the house and the street.

Get a Free Estimate

Trolls, trails and Norwegian roots

Residents adopted the Troll Capital of the World identity in the 1980s, and the village counts 40 trolls, each with its own identity. Norwegian settlers were farming between Mount Horeb and Blue Mounds by 1856, and the Military Ridge State Trail, a 39-mile bike trail on a former railroad right-of-way, has several access points in the village. It is a place where people spend time outdoors, and the requests we get reflect that: patios big enough for gatherings, walks that connect the driveway to the back yard, and pads for sheds that store bikes and gear.

Winter on high ground

Higher, hilly ground means snow and ice on slopes, and slopes are where concrete gets the most abuse from plows, shovels and salt. We pour air-entrained concrete for every exterior surface, compact a gravel base under it, cut control joints at the right spacing, and recommend sealing. On steep driveways we keep the broom texture coarse enough to give traction, and we suggest sand rather than rock salt during the first winter.

Concrete services in Mount Horeb

  • Driveways: replacement, regrading, aprons and textured finishes for slopes
  • Patios: hillside and backyard patios
  • Stamped concrete: decorative patios and walks
  • Sidewalks and steps: entry steps, landings and connecting walks
  • Garage and shed slabs: detached garages, sheds and shop floors
  • Repair and replacement: settled steps, cracked aprons and failed panels

We check what the Village of Mount Horeb requires for any work at the street or public sidewalk. Call (608) 597-6094 to book a free estimate.

Mount Horeb Facts That Shape the Work

  • Driftless Area. Mount Horeb sits in the Driftless Area, an unglaciated region of rolling hills, at an elevation of about 1,243 feet.
  • Growth. Population rose from 4,182 in 1990 to 7,754 in 2020, and the 2010 census counted 2,826 housing units.
  • Troll Capital. Residents adopted the Troll Capital of the World identity in the 1980s, and the main street is called the Trollway.
  • Trail town. The 39-mile Military Ridge State Trail, built on a former railroad right-of-way, has several access points in the village.
Concrete Repair & Resurfacing in Madison, WI

Mount Horeb Questions

Can you pour a steep driveway that will not be slick in winter?

Yes. We use a coarser broom texture on steep sections for traction, slope the surface so water does not sheet across and freeze, and plan where runoff goes at the bottom.

How do you keep water out of a garage at the bottom of a hill?

We regrade the apron where possible and can add a trench drain across the driveway in front of the door to catch runoff before it reaches the garage.

Can you build steps up a hillside to my front door?

Yes. We lay out the run so every riser is even, add landings where the climb is long, and pour the steps on a solid base.

Free Estimates in Mount Horeb, WI

Tell us about your Mount Horeb lot and project, and we will set up a free on-site estimate.

Call Now: (608) 597-6094